This page will be updated with the latest documents and info on the 2nd Tower.
Draft Environmental Assessment (DEA) (2013-11-13) – (Note that Option “E” is the design the developer is going for. You’ll see the specific Option in the bottom of the photo renderings in the DEA.)
DPP’s response to the initial DEA (2013-11-07)
Resolution for 50 foot height extension (2014-02-18)
Final Environmental Assesment (FEA) on 2139 Kuhio (2014-02-21)